Commercial Interior Fit-out
Wall cassettes, column wraps, ceiling skins, lift panels, reception surfaces, skirting and trim for commercial and civic interiors.
Review package 01
Articles / Complete index
2 articles, organized for a quick first answer and a deeper technical handoff.
01 Solutions
Instead of thirty unrelated products, choose the package that matches the contractor, project context and repeat-production pattern.

Wall cassettes, column wraps, ceiling skins, lift panels, reception surfaces, skirting and trim for commercial and civic interiors.
Review package 01
Public-area cladding, storefront skins, counters, displays, wayfinding enclosures, floor interfaces and drawing-defined wet-area components.
Review package 02
Door skins, cabinet and wardrobe fronts, drawer faces, countertop fascias and repeat OEM appearance components.
Review package 0302 Coordination
A package can contain wall panels, lift components, trims, counter skins, cabinet fronts and floor pieces. The finish schedule, grain direction, visible-face marks, part IDs and packing zones keep them connected.


03 Public and high-traffic contexts
Elevator interiors, civic buildings, mall public areas, transport spaces, floor channels, trench covers, raised anti-slip plate and wet-area niches can sit inside the three packages.
StelPanel fabricates the agreed metal component. Structure, lift-system design, waterproofing, drainage, slip requirements, code compliance and site installation remain with the customer or appointed specialist.
04 Colour and finish
Browse colour families and compare brushed, mirror and sandblasted responses. Anti-fingerprint, easy-clean and raised anti-slip routes are coordinated by project where applicable.
Base texture, light, viewing angle, geometry and production batch affect appearance.

05 Project delivery
Fabrication capability becomes useful when every sample, drawing revision, part and packing zone stays traceable through the batch.
Define part IDs, quantity, visible faces, grain and critical requirements.
Confirm material route, fabrication path and responsibility boundary.
Approve colour, texture, direction and viewing reference.
Review geometry, openings, returns, seam, surface and protection.
Produce the confirmed parts against drawing and approved sample.
Connect part, revision, finish, grain and zone labels.
Group by building, floor, zone, room, elevation or assembly.

06 Project fit
Small one-off parts may not be suitable for standalone export. Start with the package, drawing status, BOM, estimated quantity, project stage and destination.
07 Resources
Practical guidance for drawings, physical samples, grain direction, first articles, public interfaces and sequenced packing.
Connect the package boundary, drawings, BOM, finish schedule, first article and packing hierarchy.
Guide 02Build a traceable control chain around the approved sample and visible-face schedule.
ChecklistSeparate the fabricated component from specialist performance and site responsibilities.