Finish schedule
- Colour family
- Factory or supplier reference
- Base texture
- Visible face and grain

01 Topic shelves

02 Featured guide
Set the package boundary. Issue revision-controlled drawings and BOM. Build the finish schedule. Mark visible faces and grain direction. Define the first article. Plan part IDs and packing sequence.
03 Resource index
10 guides
A seven-stage guide to package boundaries, revisions, finish records, first articles and packing hierarchy.
Finish scheduleRecord the family, traceable reference, base texture, sample, visible face, direction and project-specific route.
Physical sampleUnderstand how base texture, light, viewing angle, geometry and batch change the observed appearance.
Grain directionConnect the approved sample, direction datum, visible faces, batch identity and repeatable viewing protocol.
First articleDefine geometry, openings, returns, seam, surface, protection, identity and packaging before the batch.
IdentificationBuild the hierarchy from the customer's installation plan and keep it connected to the BOM and drawing revision.
ElevatorsSeparate the decorative panel package from lift-system design, controls, qualification and site installation.
Specialist interfaceBring the drainage, waterproofing, slip, structural, code and maintenance requirements into the project review.
Partner-supportedCheck appearance, colour route, forming sequence, cleaning expectations and required evidence before production.
Repeat ordersKeep the retained sample, drawing revision, part number and batch record connected through production and reorder.
04 Colour and sample checklist
Screen previews help selection. Production approval needs a real sample linked to the finish schedule and current material route.

05 Public and wet areas
State the environment, high-contact or high-traffic condition, drainage or waterproof interface, slip requirement, authority requirements, required documents and appointed specialist.
StelPanel reviews the drawing-defined metal scope. The customer or specialist retains system design, performance criteria and installation responsibility.
06 First article checklist
Approval should connect the component to the drawing revision and physical finish reference before production quantity is released.

07 Packing sequence
Choose the levels that matter: building, floor, zone, room, elevation, assembly and part. Connect the label to the BOM, packing list and drawing revision.