Customer issue
Drawings, BOM and finish schedule
Start with drawing numbers and revisions, part IDs, quantities, finished geometry, visible faces, grain direction, critical requirements and the requested finish reference.


01-07 Delivery method
The sequence stays consistent even when the package contains mixed sizes, surfaces, curved parts, repeated components or partner-supported finishes.
Customer issue
Start with drawing numbers and revisions, part IDs, quantities, finished geometry, visible faces, grain direction, critical requirements and the requested finish reference.

Fabrication boundary
Separate confirmed in-house work, partner-supported routes and project-specific questions. Resolve the material path, process order, specialist interface and evidence needed before quotation.

Appearance reference
Record colour family, supplier or factory reference when known, base texture, viewing condition, grain direction, approval date and the retained sample. Screen colour cannot approve production.

Pre-production proof
Agree what the first article must demonstrate: geometry, opening position, returns, seam appearance, surface direction, protection, identification and packaging interface.

Confirmed route
The route may include cut-to-length and levelling, CNC laser cutting, openings, laser marking, V-grooving, folding, rolling, welding, brushing, sandblasting or confirmed polishing work.


Batch control
Connect each completed part to drawing revision, finish reference, visible face, grain direction, quantity and zone. Exact tolerances and records are agreed in the project package.

Project handoff
Protect visible surfaces and organise packages by the hierarchy supplied by the customer: building, floor, zone, room, elevation, assembly and part.

08 Capability ownership
Equipment envelopes, material limits, tolerances, capacity, MOQ and lead time remain unpublished until the factory confirms values it can consistently deliver.
In-house
Partner-supported
Confirm for project
09 Change control
A changed geometry, finish route, viewing requirement or packing sequence may require renewed review and first-article approval.
Identify what changed and which BOM lines are affected.
Confirm whether the retained sample still controls the new batch.
Define whether geometry, appearance or packaging must be rechecked.
Carry the accepted revision and sample path into later production.